Cerris Systems completed the demolition work, new waste and vent piping, and procured and installed a CO2 system at the multi-level Jewel Nightclub in the Aria Hotel and Casino.
This remodel of the previous Haze Nightclub contains a mezzanine level with VIP booths and a bar, and a dance floor level. The project required workers to operate in confined spaces on a fast-paced schedule. Our team assisted other trade partners by absorbing parts of their scopes of work — including bronze door cladding and metal trim on glass handrails.
Our scope of work on this project was installed and completed days ahead of schedule.
Additional Project Information:
General Contractor: Austin General Contracting
Project Engineer: JBA Consulting Engineers